Coming soon
Wash ablution container
20 ft ablution block with two WCs, two showers and two basins, sealed galvanised partitions, epoxy wet floor, ventilation and a tank connection.
$8,715 design estimate, not an offer
- Coming soon. Register interest to shape it.
- FK-BE-CON-115
Plumbed, ventilated and ready to connect to a tank on arrival, versus long-drop or chemical toilets on mining camps, sites and events.
Specifications.
- Size
- 6058 x 2438 x 2591 mm
- Line
- Pro
- Materials
- Container steel, Galvanised steel, Insulated panel
- Launch wave
- Wave 2
Bill of quantities
19 lines
| Part | Section | Qty |
|---|---|---|
| Cargo-worthy 20 ft | Used 20 ft shipping container (cargo-worthy) | 1 × each |
| 2 basin + WC sets | Basic plumbing fit-out (basin, WC, pipes) | 2 × set |
| Showers | Brass tap + fittings | 2 × set |
| Roof lining | Insulated sandwich panel 50 mm | 14 × m2 |
| Partitions | Galvanised sheet 0.8 mm | 4 × sheet 2.4 x 1.2 m |
| Partition frames | Rectangular tube 40x20x1.6 mm | 5 × 6 m length |
| Epoxy wet floor + walls | Enamel/epoxy topcoat | 10 × litre |
| Lights + DB | Basic electrical fit-out (DB, 4 sockets, 4 lights) | 1 × set |
| Cubicle doors | Plywood 18 mm saligna | 1.5 × sheet 2.44 x 1.22 m |
| Door sealing | PU varnish (2K) | 1 × litre |
| Doors | Weld-on barrel hinge 20 mm | 8 × each |
| Cubicle bolts | Padbolt / hasp & staple, heavy | 4 × each |
| Second entry | Steel security door leaf (bought-in) | 1 × each |
| Vents | Vent louvre + insect mesh | 6 × each |
| Extraction | 12 V cabinet fan | 2 × each |
| Mirrors | Silver mirror 4 mm | 1 × m2 |
| Tank inlet | Float valve + bulkhead fittings | 1 × set |
| Cut edges | Red-oxide primer | 4 × litre |
| Welding | Welding consumables top-up (rods/wire/gas) | 3 × kit |
Design moves.
- Two doors on the long side (male / female), each with WC, shower and basin; partitions in galvanised sheet on 40x20 frames
- Epoxy-coated floor falls to a central drain; ply cubicle doors sealed with PU
- High vents and two 12 V fans; insulated roof lining stops condensation
- Tank inlet with float valve on the roof or a stand (water-tank-stand)
- Mirror, hooks and LED lights per cubicle; solar-ready
Who does it best, and what we took.
- Sanitary containers · Containex (Austria)
Factory-fitted sanitary modules with standard couplings install in a day.
- Ablution containers · Big Box Containers (South Africa)
Separate male/female doors and easy-clean wet floors are must-haves.
How it scales.
Mining camps and contractor frameworks, NGO WASH programmes for schools, event rental; pairs with site office in camp packages.
2 fabricators + plumber/installer + electrician: 1 block a week.